IDSL works on the Latham and Watkins Project for Bancroft is due to commence in May 2025.
The works consist of GSS Supply and Extract ductwork systems on Levels 1 to 20 inclusive and are to be installed within a 22-week period.
Fire Resistant Ductwork inclusive of Fire Resistant Insulation is supplied and installed by IDSL.
Advanced Air Dampers are being used throughout the project, and these are being procured and installed by IDSL.