The Ilona Rose House Project consists of 9 floors and 4 Basement Levels. The Build of the Project is in its early stages and only the Basement Levels and Core of the building has been constructed to date. MJL are supplying the main plant and are free-issuing this to IDSL to install.
The IDSL scope of works is to install all of the Galvanised Ductwork on the Ilona Rose House Project. Fire Protection have been appointed by MJL to carry out the supply and install of Fire Rated Ductwork.
As a result, there are numerous interfaces between Galvanised and Fire Rated Ducts throughout the building. Demarcation Drawings have been submitted and the finalised scope of works for each package has been agreed by MJL, IDSL and FPL. Regular workshop meetings are being held to confirm handings of MSFDs required.
MJL have issued a combined services Installation Programme that IDSL are working to and monitoring against.
Site offices are not available yet as they are still being constructed.
IDSL works on Basement Level B4 have now commenced.