The City Gate House project is a building situation in Finsbury Square that was built circa 1920s, and is currently being refurbished with the intention of returning it to a commercial office space with a new reception and central core.
IDSL will install the ventilation systems and air conditioning systems on every floor, from the basement level 01 through to the roof level 08.
The ventilation scope comprises of ventilation risers installed within new riser shaft openings/within the existing structure and stair core areas, and that will connect to the new air handling unit systems.
This scope also includes the basement systems that serve multiple areas and dedicated plant.
IDSL’s air conditioning team will supply and install the A/C systems throughout the project, resulting in a fully commissioned and compliant system.